← All screens 02Grounds Screen 5 of 27 · Grounds

Screen 5 of 27 · Grounds

Grounds › Work order detail

/app/work-orders/{id} WorkOrderDetail.vue

Grounds › Work order detail·/app/work-orders/{id}WorkOrderDetail.vue
Hedge line along Section B
Priority 3Due FriOpen
Edit work order
Title
Category ▾Status ▾
Priority 1–5 ▾Assignee ▾2
Section ▾Plot ▾
Save changes
Contractor context3
Green Meridian Landscaping
555-0144 · yard@example.com · hedges, trees
Location
Section B · Lot 14
Complete this work order
Completion notes — what was done, by whom1
Mark complete
Documents
Photo — finished hedge2.1 MBHelen · Sep 10
File a document4
Type ▾Choose file…
Save to archive
Annotations
  1. Completion requires notes. The record is the paper trail for the family and the board; a closed work order with no notes is a gap.
  2. Assignee is a workspace member; contractor is a directory contact. Two different kinds of “who” — the form keeps them separate and labelled.
  3. Contractor card pulls from the Contractors directory — editing happens there, not inline, so the directory stays the single source.
  4. Documents upload straight into the cemetery archive from this screen; phone photos from the yard are the expected case.